Skip to content
Sheet 01 · General arrangement

Built by the peoplewho had to buy it first.

At Toyota we were the ones buying the robot cells and control systems. Now we build them, and each one runs at production rate on our floor before it reaches yours.

20,000 sq ft commissioning floor · Woodstock ON
Run record

Where our work runs.

Partial list
  • Toyota logo9 plants across North America
  • Honda logoManufacturing
  • Stellantis (FCA) logoManufacturing
  • Toronto Pearson logoInfrastructure
  • City of Toronto / CambridgeMunicipal water
  • Flowserve logoFlow control
  • CulliganWater treatment
  • Glen Dimplex AmericasConsumer HVAC
  • Bastian Solutions logoMaterial handling
  • McMaster University logoResearch
  • Brockville GeneralHealthcare
  • tesa / IPR Robotics logoRobotic application

You probably haven't heard of us. We have never advertised for work; the list grew by referral, one name at a time.

DrawingRun record
Sheet02 of 10
Rev1.0
Failure mode

Projects don't
fail on the
technology.

Projects fail on the handover: debugged on your floor, no comments in the code, and an integrator who has moved on.

Interior of a PH-built junction panel: labelled terminal rows, relays and tidy wireways
Fig. 02 · Panel interior, as shipped. The wiring is the résumé.
01

Tested before it ships

Commissioning at your plant is verification, not construction. The cell has already run at rate on our floor.

02

Project management absorbed

We carry the coordination, and we find the failure points early enough to clear them before your schedule moves.

03

Handed over with maintenance in mind

Commented code, complete as-builts, a walkthrough. You own all of it.

DrawingFailure mode analysis
Sheet03 of 10
Rev1.0
DrawingBuilt work · case studies
Sheet04 of 10
Rev1.0
DrawingBill of capabilities
Sheet05 of 10
Rev1.0
Mechanical division · est. 2022

Turnkey means
the metal too.

In 2022 we built the mechanical division so the metal is our problem rather than yours. We design it, we run the machining, fabrication and finishing through suppliers we hold to our own drawings, and it comes back here to be assembled, tested and validated alongside the controls.

About 40% of our business is mechanical
Two PH Engineering staff assembling a large powder-coated frame structure on the shop floor
Fig. 03 · Assembly on our own floor, machined and finished to our drawings
Raw welded steel weldment for a machine base, uncoated, on the fabrication floor
Fig. 04 · Fabricated in steel, before finishing
Powder-coated machine frames lined up on the shop floor after finishing
Fig. 05 · The same frames, powder coated
DrawingMechanical division
Sheet06 of 10
Rev1.0
Alarm state · recovery work

Somebody else
installed it.
It doesn't work.

A system another integrator left behind, and downtime that keeps repeating. We get called in to make it run. Manufacturing Outlook noticed the pattern when they profiled the firm in 2024: a run of case studies that began with somebody else's install.

  • F01Code nobody can read, from a vendor who's moved on
  • F02A cell that never reached its quoted cycle time
  • F03Commissioning that was never actually finished
  • F04Recovery routines that don't recover
  • F05The same fault, repeating every week
Platform schedule

We work
on what
you run.

Platform-neutral. This is what our clients actually run, not a limit on what we'll take on.

  • Allen-Bradley logo
  • Siemens logo
  • Mitsubishi Electric logo
  • Omron logo
  • Keyence logo
  • FANUC logo
  • Yaskawa logo
  • Schneider Electric logo
  • Inductive Automation (Ignition) logo
  • Atlas Copco logo
  • Stanley Engineered Fastening logo
  • Interroll logo
  • Bastian Solutions logo
  • JTEKT (Toyoda) logo
  • + what your
    plant runs
PlatformApplied toTypical hardware
Allen-Bradley / RockwellPLC · HMI · DrivesControlLogix, CompactLogix, PowerFlex
SiemensPLC · HMI · DrivesS7-1200/1500, TIA Portal
Schneider ElectricPLC · HMI · DrivesModicon, EcoStruxure, Altivar
MitsubishiPLC · DrivesVFD, EtherNet/IP motion
OmronPLC · VisionNJ/NX, FH series
KeyenceVision · SensingCV-X, IV series
FANUCRoboticsR-30iB, cell integration
IgnitionSCADA · DataPerspective, Historian
Atlas Copco / StanleyFastening · QualityTorque verification
InterrollMaterial handlingDriveControl roller conveyance
DrawingPlatform schedule
Sheet07 of 10
Rev1.0
Vendor file

What you'd
check anyway,
answered.

Every shortlist screens on the same criteria. Here are ours in one place.

CriterionPH Engineering, on record
Scope of serviceDesign, machining and fabrication, panel build, programming, in-house testing, installation and commissioning under one contract. One point of responsibility.
Business stabilityIncorporated 2017. P.Eng-led. 20,000 sq ft commissioning floor opened 2024. Growth by repeat and referral.
Mechanical capabilityMechanical division since 2022: design in-house, machining, fabrication and finishing through qualified suppliers, assembly and validation on our floor. About 40% of the business.
Industry experienceAutomotive assembly is the core. Also on record: food processing, grain handling, municipal water and major irrigation systems.
Vendor neutralityWe program what your plant already runs, per the schedule above. Nobody gets steered to a house brand.
Safety & complianceRisk assessment, safety-rated circuits, two-hand controls, guarding, and sign-off documentation.
Documentation & handoverCommented source, complete as-builts. You own all of it, no locked files.
RecognitionTop 10 Industrial Engineering Services Providers in Canada, 2024 (Manufacturing Outlook). BBB rating A+.
DrawingVendor file
Sheet08 of 10
Rev1.0
Witness statements
The team was extremely efficient and professional. They provided important insights into our processes and were able to respond to all of our needs each step of the way, on time and on budget.
Engineer
Toyota Motor Manufacturing Canada
I can completely trust their team to represent our company professionally with our customers. During one project with an extremely tight timeline the team pulled all their resources to make it happen.
General Manager
Third House Solutions
DrawingWitness statements
Sheet09 of 10
Rev1.0
Issue for construction

Tell us what
you're building.

Send the drawings, the spec, or the problem. We'll tell you whether we're the right people for it, and what it would take.

DrawingIssue for construction
Sheet10 of 10
Rev1.0